people working at desks in open office. How to approach best hospitality property services in practice
Photo by Arlington Research on Unsplash

Costs

Part of Hospitality property: forms, deadlines and examples

How to approach best hospitality property services in practice

Hospitality property services hired in sequence: licensing first, then building services, then design and construction, with the question each must answer.

Hospitality projects fail in a fixed order. The license does not issue, or the kitchen cannot be built in the shell, or the approvals stack up so slowly that the money runs out before opening. The services worth hiring are the ones that address those three failures, and the way to judge each is to ask whether they work in that order.

What to take away

  • Hire in sequence: licensing first, then building services, then design and construction. A designer engaged before the license question is answered is drawing a restaurant that may never open.
  • Judge a kitchen designer on exhaust, make-up air, grease and waste, not on the rendering.
  • Every adviser should be able to name the specific local offices they deal with and what those offices have refused recently.

The sequence, and who belongs at each stage

Stage Question Service that answers it
1 Can a license issue for this premises and this operator, with what conditions? Licensing consultant or a lawyer who practices before that authority
2 Can the building physically carry the kitchen? Mechanical engineer, with a kitchen designer's equipment schedule
3 What will the lease let me do, and what happens if the approvals fail? Lawyer with hospitality leases
4 What does the room and the kitchen look like, and will the health authority pass it? Foodservice or kitchen designer, architect
5 How long will the approvals and the build take, and who manages them? Project manager, expediter, contractor with health inspection experience

Engaging stage 4 before stage 1 is the most common and most expensive mistake. The reason the license comes first is set out in hospitality property.

Licensing: ask about the office, not the law

Alcohol, entertainment and late hours are licensed locally, on local timetables, sometimes at hearings where neighbors can object. A licensing adviser's value is in knowing that office.

Ask them:

  • Which authority decides for this address, and how long its process has been running lately?
  • What has that authority refused recently, and why?
  • Does a license here attach to the premises, the operator or both, and what conditions are typical?
  • Are there distance rules, caps on licenses, or residential objection patterns in this district?
  • What would you want in the lease to protect me if the license is refused or delayed?

A good answer names the office, describes the process from experience, and volunteers the lease protection. A weak answer describes licensing in general.

Engineers and kitchen designers: ask about the services

A kitchen rendering tells you nothing about whether it can be built. Ask the designer and the engineer, together if you can:

  • Where does the exhaust go, what is the route to the outside, and do I have the right to use it? Commercial kitchen exhaust is governed by standards such as NFPA 96, and the version the local fire authority enforces is the one that matters.
  • How is make-up air supplied, and where does that plant go?
  • What is the grease interceptor sizing, where does it sit, and who services it?
  • What electrical and gas capacity does the equipment schedule need, and does the building have it?
  • Where does waste live, including refrigerated waste if the volume needs it?
  • What in this design will the health authority and the fire authority want to see, and have you had a design refused here?

A designer who answers the last question with a story is one who has been through the inspection. One who has not will find out on your project. Most states build their retail food rules on the FDA's model Food Code, so a good designer can tell you which edition the inspector where you are will be working from.

If the designer is attached to an equipment supplier, ask whether the design fee is credited against equipment and whether they will design around another supplier's line. The conflict is normal; the disclosure is what you are testing.

Lawyers: ask what the landlord's form does to a restaurant

A general commercial lease review will cover rent, term and repair. A hospitality lease needs more, and a lawyer who does them will list it unprompted: the license contingency or due diligence period, rent commencement tied to the license and to delivery, roof and riser rights for the exhaust, hours and noise provisions, the definition of gross sales in a percentage rent clause, continuous operation and radius covenants, the assignment standard that decides whether you can sell the business, and the surrender obligation for the kitchen.

Ask which of those the landlord's form in this area usually resists, and what they got last time. The general framework for those clauses is in commercial leasing.

Project managers and expediters: ask about the queue

Hospitality builds run long because approvals are sequential. Judge anyone who offers to manage the process on whether they can describe the local queue.

  • Which approvals here can run in parallel, and which cannot start until another is issued?
  • How long has each office been taking recently?
  • What has stalled your last three projects, and for how long?
  • How do you handle a change requested by an inspector after construction has started?

The way the program interacts with the rent-free period and the allowance is set out in tenant improvements. A project manager who does not ask about the commencement date is managing the build and not the money.

The one-site test

Take a site you have already looked at. Ask each candidate for a short written view:

  • The licensing adviser: whether a license is likely for this address and operation, and what would need to be in the lease.
  • The engineer: whether the shell can carry the kitchen, and the three biggest unknowns.
  • The lawyer: the five clauses they would open first in the landlord's form.
  • The project manager: the approval sequence and the realistic time to opening.

Compare their answers with what you found yourself. Where they saw a problem you missed, hire them. Where they missed the exhaust route or the license, do not.

Where the address is still open

If you are choosing between districts rather than units, the licensing position in each district is a site selection input, not a later detail: some areas have caps, some have organized objectors, some have residential adjacency that constrains hours. Ask the licensing adviser before the search, and put the answer beside the trade analysis. The way to ask a planning office what a district allows is covered in zoning and permits.

Common questions

Do I need a licensing specialist for a cafe without alcohol?

Probably not, but you still need the planning and health questions answered for the address, and a project manager or your architect can usually do that.

Should the kitchen designer and the engineer be the same firm?

It can work and it removes a handover. Judge them on the services questions above; a designer who cannot discuss make-up air needs an engineer beside them regardless.

What is the biggest sign of a weak adviser?

They start with the design. Anyone who wants to draw the room before the license and the exhaust route are known is selling you a drawing.

How early should the lawyer be involved?

Before the letter of intent. The license contingency and the commencement mechanism are agreed there, and they are hard to add later.